
Luton & South Beds. Joint Planning Committee (JPC)
Jan / Feb 2010? Joint Technical Unit works on revamp of Preferred
Options Document
Just what the JTU needs to do to get a revised version of the core strategy depends upon which of the 3 options are decided by the Joint Planning Committee. If it’s Option 3 – reconsider all 13 original possible alternative sites – then the timescale suggested here is likely to be extremely optimistic.
Have in mind that the stage we have now reached is that the next version of the Core
Strategy that goes to the legally-
To understand more, please read the notes for the next two boxes in the timeline.